Committee Dashboards

ENG12 Action Plan

The tasks have been agreed by the ENG Committee Management Team to be progressed during ENG12 through virtual Task Groups (TG).  Each task has a deadline for expressions of interest to participate in the specified Task Group Leader by a certain date. Once the participants wishing to work on a task have been identified, the timings of the meetings will be arranged by the Task Group Leader in liaison with the Secretariat.

Task Other Actions / Comments Task Group Leader Deadline for expressions of interest to participate in a TG
WG1 | 2.2.4 Revise Guideline on Effective Intensity

Brief final review before submitting for approval.

Inputs ENG12-3.1.3.1/2 refers.

Dr Alwyn Williams

Alwyn.Williams@gla-rad.org

2nd Oct
WG1 | 2.2.7 Develop Guidance on Colour Fading of AtoN (plastic and painted) – methods to measure and assess

Continuation of updating Guideline G1134.

Inputs ENG12-3.1.1.1/2 and ENG12-3.1.2 refers.

Mr Jorgen Royal Petersen

JRP@dma.dk

2nd Oct
WG1 | 2.2.2 Develop new recommendation on marine light Terms of Measurement Continuation of creating a new recommendation.
Input ENG8-9.2 refers.

Dr Alwyn Williams

Alwyn.Williams@gla-rad.org

2nd Oct
WG1 | 2.2.3 Develop E200-5 on Optical Performance into a Guideline New work based on existing Recommendation text.

Mr Malcolm Nicholson

m.nicholson@sealite.com

2nd Oct
WG2 | 1.1.1 Revised guidance on Simulation Technology to revise G1097 (ENG10-14.2.7) in cooperation with ARM (task 1.2.4)

Monitor ARM outcome

Work overtaken by ARM, see ARM11-10.11 WP Draft Guideline 1097 Ed.1.1 Technical Features and Technology Relevant for Simulation of AtoN

ENG10-3.1.25 Liaison note

ARM,
ENG Rapporteur Simulation Mr Yeo Jimin
2nd Oct
WG2 | 1.2.1 Develop Guidance on checking that 3rd party AtoN providers are providing what they are obliged to provide– 3rd party AtoN provider quality control. (Joint  ARM cooperation)

Further development

 

ENG10-14.2.12 last version ENG10-3.1.7 Liaison Note from ARM: ENG leading

David Jeffkins david.jeffkins@amsa.gov.au

Greg Hansen greg.hansen@amsa.gov.au

2nd Oct
WG2 | 2.3.1 Develop guidance to identify appropriate standards for AtoN equipment with extreme environmental conditions. Humidity, temperature, enclosure ratings, UV etc)  Also including peak intensity specification for  LED  AtoN,  batteries,  optic  service  factor,  thermal  cap,  etc. Continue work on input paper

Mr Mariano Luis Marpegan

mlmarpegan@gba-hidrovia.com.ar

2nd Oct

 

WG2 | 2.3.3

Develop Guideline on Tidal flow data capture and display

ARM11-8.1.1 WP Annex 1 – Draft Guideline on Tidal Current Signal System (ARM10-13.2.7.1)

ENG10-9.3 WP Draft GL

ENG10-14.2.5 Liaison Note to all Committees: Support request

To be announced 2nd Oct
WG2 | 2.3.5 Joint workshop with all 4 technical committees on Cyber Security in AtoN operations CCG pursuing approval to hold in Canada in October 2020 To be announced 2nd Oct

WG2 | 2.4.1

Develop Guidance on what constitutes a good marine AtoN solar panel

Continue work on input paper

Mr Peter Dobson

Peter.Dobson@trinityhouse.co.uk

2nd Oct

WG2 | 2.5.1

Develop guidance quantifying characteristics to meet nautical and operational requirements and ways to verify them

Postponed to ENG13

TBC

Mr Peter Schneider

Peter.Schneider@wsv.bund.de

2nd Oct

WG2 | 2.5.2

Develop new guideline on radar reflector (reflection) properties

Continue work on input paper

Mr Peter Schneider

Peter.Schneider@wsv.bund.de

2nd Oct

WG2 | 2.5.3

Creating an overview guidance on floating AtoN

Postponed to ENG13

TBC

Mr Peter Schneider

Peter.Schneider@wsv.bund.de

2nd Oct

WG2 | 5.1.1

Review telemetry Guideline 1008

Continue work on Guideline

Mr Peter Dobson

Peter.Dobson@trinityhouse.co.uk

Mr Peter Schneider

Peter.Schneider@wsv.bund.de

2nd Oct

WG3 | 3.1.1 Resilient PNT

Guideline on resilient PNT

During the ENG11 period a structure of a new Guideline was proposed which included updating and incorporating the contents of R-129, G. will be developed further.

Dr Alan Grant

Alan.Grant@gla-rad.org

2nd Oct
WG3 | 3.2.2 / 3.2.3 / 3.2.5 Terrestrial positioning and timing: R-Mode (all related items)

Understanding the latest developments on R-Mode requirements, activities and roadmap updates

The draft Guideline was developed further during ENG11 and work on this will continue during the ENG12 period

Mr Michael Hoppe

michael.hoppe@wsv.bund.de

2nd Oct
WG3 | 3.2.6 Terrestrial positioning and timing: S-200 product specifications

Updated version of S-240 review along with any updates to S-245, S-246 and S 247.

Guidance note being developed, in collaboration with the Secretariat, on the role of these performance standards and the overall approval process.

Mr Younghoon Han

yhhan@kriso.re.kr

 

2nd Oct
WG3 | 3.3 Racon and radar positioning Guideline on an Enhanced Radar Positioning System could be developed further

Mr Paul Mueller

paulfmueller@sbcglobal.net

2nd Oct
WG3 | 3.4.2 / 3.4.4 Augmentation Services: DGNSS Guidance A draft Guideline that supports administrations seeking to maintain their services and those seeking to retire their DGPS was developed at the future of DGNSS workshop, the same will be reviewed and updated.  The WG should consider whether items 3.4.2 and 3.4.4. can be merged into one task fulfilled by the draft Guideline.

Mr Jesper Backstedt

jesper.backstedt@sjofartsverket.se

2nd Oct
WG3 | 3.4.3 Augmentation Services: New Recommendation on Augmentation for maritime use Final draft Rec. has been provided to ENG12 seeking comments from the wider Committee.

Mr Etienne Leroy

etienne.leroy@cerema.fr

2nd Oct
WG3 | 3.4.5 Augmentation Services: High accuracy systems The WG should consider the on-going need for this task and update the task register accordingly. 2nd Oct
WG3 | Additional items of review and update WG3 has been asked to review the Navguide as a separate task during this period

Dr Alan Grant

Alan.Grant@gla-rad.org

2nd Oct
WG4 | 2.6.3 / 2.6.4 / 2.6.5  / 2.6.6 Environment, Sustainability & Legacy: Heritage IALA website

Review progress of Heritage IALA website

Acquire consent from nominees for the publication of nomination forms and photos of nominations onto the IALA website.

Assess progress of Award artwork and presentation in respect to IALA Heritage Lighthouse of the year 2020 to Barra Lighthouse, Salvador, Brazil ensuring a plan is in place

Write article for publication in IALA Bulletin on IALA Heritage Lighthouse 2020 (Barra Lighthouse, Salvador, Brazil) and invite nominations for the 2021 accolade (deadline February 2021.

Progressing the Heritage module within the IALA Level 1.1 course.

Discussion and development of proposals to form future work programme.

Development of a new IALA Guidance Document: ‘Modernising Heritage Marine Aids to Navigation’

Mr Peter Hill

Peter.Hill@trinityhouse.co.uk

 

 

2nd Oct